Screw-Piles: Why perform a lateral test?
Lateral testing – also known as lateral load testing – assesses the lateral forces required to provoke movement in an installed pile. That is, forces coming to the side of the pile. A hydraulic winch or jack is often used to pull piles towards each other and push them apart. The results of the testing will show you how much lateral force is needed to move the pile before failure.